Connected to the grid with net metering: daytime solar runs your home, surplus units offset your night usage, and the PM Surya Ghar subsidy cuts your cost by up to ₹78,000.
The on-grid system is the most popular solar choice in India — no batteries, lowest cost, fastest payback.
| System | Turnkey Price (2026) | After Subsidy* | Generation |
|---|---|---|---|
| 1 kW | ₹55,000 – ₹75,000 | ₹25,000 – ₹45,000 | 4–5 units/day |
| 3 kW | ₹1,65,000 – ₹1,95,000 | ₹87,000 – ₹1,17,000 | 12–15 units/day |
| 5 kW | ₹2,60,000 – ₹3,10,000 | ₹1,82,000 – ₹2,32,000 | 20–25 units/day |
| 8 kW | ₹4,20,000 – ₹5,00,000 | ₹3,42,000 – ₹4,22,000 | 32–40 units/day |
*PM Surya Ghar subsidy: ₹30,000/kW (first 2 kW) + ₹18,000 (3rd kW), max ₹78,000 via DBT. GST extra.
Tata Power, Adani, Waaree, Vikram, Goldi or RenewSys — 540–600 W modules with 25-year performance warranty.
Growatt, Sungrow, Havells, Polycab or Livguard with Wi-Fi app and 5–10 year warranty.
Wind-rated 150+ km/h, rust-warranty structure with proper airflow clearance.
DISCOM application, inspection coordination and net meter installation — Rajasthan's 15-day rule.
We file your PM Surya Ghar application and follow it till the DBT credit lands.
Cleaning, generation audits and priority service across 28+ districts.
No — for safety, on-grid inverters switch off during grid outages. If you need backup during cuts, choose a hybrid system instead.
They are exported to the grid through your net meter and adjusted against your night-time consumption — most on-grid homes see bills drop 80–100%.
Installation takes 2–5 days after approval, the net meter typically comes within 15 days in Rajasthan, and the subsidy credit follows in ~30 days. Total journey: 2–4 weeks.
Share your monthly bill and roof details. Our engineer will call with a written quote and subsidy calculation.
✅ Thank you! Your enquiry has been sent — our team will call you shortly.